New house decoration steps and precautions to read the renovation is not late

After getting the key to a new house, how to decorate a new house has become a top priority for the owner. Before the renovation, the most important issue for every owner who is preparing to decorate is not only to do a good job in the renovation budget, but also how to grasp every detailed step in the new house decoration process, and to have an overall understanding of the specific process, and to prepare from the beginning. At the end of the renovation, what are the specific steps for the renovation of new homes ? Wandering around on the Internet and seeing many cases of cutting corners and shoddy work, the decoration team shoddy cases will inevitably surprise us. It seems that the new house decoration is not sloppy, new house renovation steps and new home renovation strategy or have to learn and study.

New house renovation steps

I. Preliminary design and demolition of hydropower renovation woodworking tiles

Tools in place, ready

Before decorating, you must prepare a few things in your bag. Tape measure (buy 5m, not 3m), calculator, big plate clips (folder list, receipts); In addition, it is best to prepare old towels on the site early (the kind of soft cotton, rubbed with bricks) , plastic bag (wrapped on the pipe interface, can prevent dirt blockage).

1, pre-design

The design of new housing should be based on their own living habits, and a detailed measurement of their own room, this step can not be lazy, it is best to personally measure it again, the content of the measurement mainly includes: clear the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area, and the main wall size. In particular, it is necessary to design the wall size of the furniture later.

2, the main demolition reform

Into the construction phase, the main demolition reform is the first project on the first, mainly including the demolition of walls, walls, spade shovel, demolition heating, change steel windows and so on.

3, hydropower reform

At this time, the demolition of the main structure should be basically completed and the hydropower reform can be carried out. Between the two stages of hydropower reform and main body demolition, the first measurement of cabinets should also be carried out. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not processed, the cabinet designer can not give a specific design size, but only for the developer reserved water inlet, hood socket Location, make some suggestions. Mainly include: Look at the position of the socket of the hood to influence the installation of the hood; see if the position of the meter is appropriate; see if the position of the nozzle is convenient for installing the sink later. For the first measurement of cabinets, slightly experienced owners can do it themselves. After the completion of the waterway reconstruction, it is best to do the waterproofing of the bathroom, and the kitchen does not generally need to be waterproof.

4, woodworking

Carpenters, bricklayers, and oil workers are the "three brothers" in the construction process. The basic order of appearance is: wood-tile-oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is above" is also one of the basic principles that determine the order of home improvement.

5, tiling

In the process of “laying a bricklayer's second child”, it also involves the installation of three links: the installation of a door stone and a marble window sill. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now. The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. Therefore, we should catch land drains as early as possible. The hood is the first appearance of the appliance. After the kitchen tiles are laid, you can consider installing the hood. After the kitchen tiles have been attached and the hood has been installed, the second measurement of the cabinet can be approximated.

  

Second, the wall painting kitchen and ceiling installation has a succession

1, brush wall paint

The “oil worker's third child” entered the field and mainly completed the work of basic wall surface treatment, brush finish, and painting of furniture hit by the “wooden boss”. To prepare a wallpaper, you just need to let the "oil worker" in the plan to do wallpaper on the wall.

2, kitchen and ceiling

Cupboard ceiling as the installation of the first team, or in the continuation of the home "packaging." At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is best to install ceiling lights and exhaust fans (bath heaters) at the same time, or to leave the heads and openings.

3, cabinet installation

After the ceiling is over, the cabinet door can be installed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas.

4, wooden door installation

On the second day of cabinet installation, as soon as the wooden door measurement was completed more than one month ago, it is now possible to install it. The hinges, door locks, and suction are installed at the same time as the door is installed. Prepare related hardware in advance. If you want the wooden door manufacturers to install window covers and gargles, they should be measured together when the wooden door manufacturers measure them, and they should be installed on the same day that the wooden door is installed. At the same time, the installation time of the marble window sill should be considered wrong. After installation.

5, floor installation

The floor can be installed the next day after the wooden door is installed. Floor installation requires attention to the following issues: 1. Before the floor is installed, it is advisable for the manufacturer to survey whether the floor needs leveling or local leveling. At the same time, the floor of the home's paving floor should be cleaned and the ground must be kept dry. Therefore, do not use water during the cleaning process. 2, when the floor is installed, if conditions permit, the cutting of the floor must be in the corridor. Cutting floors indoors is more serious than wall contamination.

Third, wallpaper paving socket installed hardware sanitary ware

1, paving wallpaper

On the second day after the floor is installed, the home is cleaned and the wallpaper can be pasted. If there are conditions, on the day that the wallpaper is laid, the floor should be protected. Before paving the wallpaper, try to "don't have anything" on the wall.

2, radiator installation

On the second day after the wallpaper was laid out, it was time to put the radiator on the wall. Wooden door - floor - wallpaper - heat sink, this is a generally recognized correct installation order, first install the wooden door is to ensure that the baseboard of the floor can be closely integrated with the door of the wooden door cover; after loading the wallpaper is mainly because of the floor The installation is more dirty, more dust, and serious wallpaper pollution. Here again I used the principle of "who is dirty? The final radiator is installed because only the wallpaper on the wall can be installed to install the radiator.

3, switch socket installation

Owners should have a detailed understanding or record of the number of switches and outlets at home and their location, especially for wallpapers. Sometimes wallpaper workers are irresponsible. Wallpapers are hulah and they don't use wallpapers. Mark the opening of your switch socket. Therefore, the owners still need their own minds.

4, lighting installation

Loading lights, nothing to say. After the lights were installed, the home was bright and bid farewell to the dazzling glare of the 100-watt incandescent bulbs during the renovation - it felt good.

5, hardware sanitary installation

Before buying good plumbing, bathroom accessories, toilets, drying racks, etc., they are all installed. After those “big things” were installed, the family was still “cold”. After the fixtures and hardware were installed, the family “lived” and really “lived”.

  

Fourth, the end of the installation of the furniture approach to thoroughly clean the accessories on the field

1, curtain rod installation

The installation of curtain rods marks the end of home improvement.

2, pioneering cleaning

Don't install curtains before cleaning up. When pioneering cleaning, homes should not have furniture and unnecessary appliances. Try to keep more "flatness" so that the pioneering cleaning can be thoroughly cleaned.

3, furniture approach

With regard to the purchase time of furniture, my suggestion is that after the completion of the transformation of the water circuit at the earliest, the basic size range of the furniture we choose is only a few.

4, home appliance installation

At this time, the entrance of the appliance to enter the field, the installation of the installation, ready to stay!

5, home accessories

Home accessories, the final step of home improvement, and has been transformed from decoration to decoration, including the installation of curtains are part of home accessories. As for the purchase of curtains, it is best to order furniture to avoid style conflicts. Home accessories also include consideration of buying some green plants, wall paintings, and crafts... In short, after your stay, you will be free to play.

Editing summary: The above is the new house decoration steps and precautions related to the renovation of the knowledge is not too late to read, although the decoration is cumbersome, but follow the steps step by step slowly, or according to their own home to make some small adjustments, it is not There will be too many mistakes and delays.

New Home Decoration Notice New Home Warm Decoration Design New Bedroom New Home Deodorant New Home New Home Renovation Steps

Door skin is one of main products of Luli Group Co., Ltd(Mainland).Our high quality Door Skin is adopting HDF as basic material, surface laminated Natural Veneer, melamine paper or pvc.  during vacuum molding machine, the high temperature and pressure, with one or two forming technology to produce.

Advantages of Door Skin:

• Eco-environmental

• More beautiful

• More convenient

• No cracking, no deformation

Usage of Door Skin:

Luli Group Co., Ltd adopting"Prodcution line, Ecological development", has been selected and favored by more and more customers. It is mostly used as the main material of door of Kitchen, Washing Room, Baching room etc.

Kinds of Door Skin:

• One forming Door Skin

• Two forming Door Skin

• Natural Veneer Door Skin

• Melamine Door Skin

• PVC Door Skin

Details of Door Skin:

Size: 660/720/820/920/1020/1050x2150

Thickness: 2.8MM, 3MM, 4.2MM

Material: HDF

door skin

Door skin

Door Skin,Veneer Door Skin,Wood Door Skin,Door Panel Skins

Luli Group Co.,Ltd. , https://www.cnluli.com