Renovation begins! How to do a good job on the spot

1, multi-communication

Before the start of construction, the owners, designers, project managers, and construction personnel must be present together to confirm the overall design and construction content of the house, communicate with each other well, and determine the specific time points and design content in order to ensure smooth construction in the future.

2, protect the entrance door

In order to prevent the entrance door from being damaged during the construction process, the decoration company should use a special door sleeve and protective film to wrap the door and handle tightly.

3, straight angle

Put professional measuring instruments on the corners of the wall and check whether the angles of the yin and yang are vertical from the numbers displayed on the tool to ensure accuracy.

4, confirm the project details

According to the design plan, the designer will introduce the power and water construction personnel in detail about the layout of the power and water pipes, and the construction details of each room.

5, measuring wall empty drum

Many seemingly sturdy homes have a lot of hollows in their walls, even in heavy walls. Therefore, strict inspections must be carried out and repaired before construction.

6. Location of facilities

Each construction site has designated areas for assembly of tripods, stacking lightweight materials, hanging construction schedules, placing fire extinguishers, and so on, so that the site appears to be methodical and orderly.

7, confirm the pipeline layout

The construction staff repeatedly used a small hammer to strike the floor of each kitchen and bathroom, carefully inspected the laying quality of the floor and the pipe layout of the apartment itself, so as to avoid erroneous excavation in the future.

8, check the water up and down

Checking whether the floor drain is unobstructed is an important step in the acceptance of the house. If it is found that the flow is obstructed, it is necessary to contact the property in time to solve it. Otherwise, after the construction, it is difficult to judge which side the responsibility belongs to.

9, protect the water outlet

Sealing protection is provided for each tested sewage pipe nozzle at the site to prevent dust and rubbish from falling into the pipeline during future construction.

Construction Crossing House Design Decoration Company Residential Room House House Decor

Sheet & Pipe Plasma Cutting Machine mainly for 3 axis 2D drawing cutting and round pipe cutting

1.This design fit for multifunction cutting requirements: both metal sheet and pipe cutting

2. Accept OEM for any pipe cutting diameter and working length. ( Normally from 100mm up to 600mm dia. )

3. Accept OEM for any table size: likes 4x4, 4x8 Plasma Cutting Table

4. Accept any materials cutting: Iron plate, Stainless steel plate, Titanium plate, Galvanized sheet, Aluminum plate, High speed steel etc

Sheet & Pipe Cutting Machine

Steel Pipe Cutter,Sheet Cutting Machine,Metal Sheet Cutting Machine,Stainless Steel Cutting Machine

Jinan Huaxia Machinery Equipment CO.,Ltd , https://www.cnmetalcutting.com