Magnetic centrifugal pump for the installation and piping inspection

Magnetic centrifugal pump group should be installed in place when the pump plate base plate level and the preparation of the pipeline inspection. When leveling and configuring the piping on the base plate, the order in which the base and pump unit are installed must be adhered to, in the following order. 1) Set the magnetic centrifugal pump unit to the pump base. 2) Add wedges around the base to level the unit and check with a level gauge. Tighten the nut of the mounting bolt on the floor to check if the floor is level. Correct if necessary. 3) Check the direction of rotation of the motor by removing the coupling, testing the direction of rotation of the drive or by jogging the motor start button. If the motor is steered correctly, continue with the alignment. If the steering is incorrect, reconnect the motor wiring and check the steering. After the motor is turned to the right to continue to find work. Electrical equipment for debugging, not live work. 4) press the magnetic centrifugal pump and motor to find the correct requirements of the motor together with the magnetic centrifugal pump to find positive. After the magnetic centrifugal pump and the driver are calibrated, the bottom plate is filled with mortar according to the grouting requirements of the construction drawings. 5) to ensure that the pump configuration pipeline does not produce stress with the pump unit. 6) According to the requirements of the pump and the motor to check the pump and motor alignment to ensure that the pump unit is not deformed due to pipe stress. In the event of a misalignment, correct the piping error and try again to center it. 7) Check the condition of the pump and the motor when the pump reaches the operating temperature during operation. After about 2 months of normal operation of the pump, check the condition of the pump and the motor again while hot. If there is a change in the search results, re-correct it, and in 2 months after the review. 8) When the pump is installed above the liquid level (within the allowable suction range of the pump), the bottom valve should be installed on the suction pipe end and the screw hole or valve should be set on the discharge pipe to start the pre-irrigation Pump use. Pump installed below the level of the liquid, should be installed in the suction pipe control valve and filter device to prevent debris sucked into the pump. 9) After the magnetic centrifugal pump is installed, the motor cover should be opened and the fan impeller should be turned. It should feel light and even, and pay attention to discern whether the pump is in contact with the friction noise and foreign matter rolling and other noise. If so: you should try to rule out.

Spanner

Ball Point Hex Key Set,Cross Rim Wrench,Y Style Socket Wrench,American Type Handle Wrench

SHAOXING SINO IMPORT & EXPORT CO.,LTD , https://www.sxsmarto.com