Four major precautions in the shower room installation to prevent water leakage is the key

In the bathroom, the shower room is not very large. However, with it, it can effectively achieve dry and wet separation, and in winter, it can play a role in keeping warm. However, after the decoration of many owners' shower rooms, there are problems such as water leakage, poor installation, and poor sliding of sliding doors. Therefore, this article is a precaution for everyone to popularize the installation of shower rooms, so that you do not have a shower room. The troubles of using the process!

First, the shower room installation preparation

Before installing the shower room, first prepare the materials and tools.

Material preparation: The materials used in the installation of the shower room include accessories such as frame, tempered glass, handle and pulley.

Tool preparation: In the shower room installation process, you still need a lot of tools. Before installation, these tools are all ready. The tools used in this installation include tape measure, pencil, impact drill, hand hammer, electric screwdriver, glue gun, manual screwdriver, wire cutter, etc.

Second, the shower room frame fixing method

The first step in the installation of the shower room is to find a location, punch holes, and then fix the border. More tools are needed to find and punch holes, and the operation is more complicated. Let's take a look at how the installer is doing this step.

1. Determine the drilling position: use the tape measure + pen

The shower room must be fixed. The fixing method is generally to use screws. The holes on the aluminum alloy frame of the wall have been reserved. The corresponding position is to mark the corresponding position of the wall. The method is to put the border on the wall, the tape measure to ensure the correct position, and then mark the wall with a pencil.

Second, the shower room frame fixing method

The first step in the installation of the shower room is to find a location, punch holes, and then fix the border. More tools are needed to find and punch holes, and the operation is more complicated. Let's take a look at how the installer is doing this step.

1. Determine the drilling position: use the tape measure + pen

The shower room must be fixed. The fixing method is generally to use screws. The holes on the aluminum alloy frame of the wall have been reserved. The corresponding position is to mark the corresponding position of the wall. The method is to put the border on the wall, the tape measure to ensure the correct position, and then mark the wall with a pencil.

Second, the shower room frame fixing method

The first step in the installation of the shower room is to find a location, punch holes, and then fix the border. More tools are needed to find and punch holes, and the operation is more complicated. Let's take a look at how the installer is doing this step.

1. Determine the drilling position: use the tape measure + pen

The shower room must be fixed. The fixing method is generally to use screws. The holes on the aluminum alloy frame of the wall have been reserved. The corresponding position is to mark the corresponding position of the wall. The method is to put the border on the wall, the tape measure to ensure the correct position, and then mark the wall with a pencil.

Second, the shower room frame fixing method

The first step in the installation of the shower room is to find a location, punch holes, and then fix the border. More tools are needed to find and punch holes, and the operation is more complicated. Let's take a look at how the installer is doing this step.

1. Determine the drilling position: use the tape measure + pen

The shower room must be fixed. The fixing method is generally to use screws. The holes on the aluminum alloy frame of the wall have been reserved. The corresponding position is to mark the corresponding position of the wall. The method is to put the border on the wall, the tape measure to ensure the correct position, and then mark the wall with a pencil.

Second, the shower room frame fixing method

The first step in the installation of the shower room is to find a location, punch holes, and then fix the border. More tools are needed to find and punch holes, and the operation is more complicated. Let's take a look at how the installer is doing this step.

1. Determine the drilling position: use the tape measure + pen

The shower room must be fixed. The fixing method is generally to use screws. The holes on the aluminum alloy frame of the wall have been reserved. The corresponding position is to mark the corresponding position of the wall. The method is to put the border on the wall, the tape measure to ensure the correct position, and then mark the wall with a pencil.

2, punching: using impact drill

The first step: After setting the position, the next step is to punch holes. The punching is also carried out in two steps. First, a shallow hole is drilled on the wall by using a drill with a circular drilled hole.

Construction Tips: Because the wall of the bathroom has been covered with wall tiles, it is relatively hard. To make drilling easier, you can wet the drill bit. In addition, you can pour some water while punching.

Step 2: After punching out the prototype mark hole, the next step is to use a spiral drill with a stronger impact. On the basis of the shallow holes that have been punched, make a deeper hole.

3, install the rubber: use the hand hammer

Before the screws are pushed into the wall, firstly, the expansion rubber particles need to be installed in the holes, and the rubber particles can better tighten the screws. Use a hand hammer to knock the rubber into the borehole.

4, fixed border: use electric screwdriver

After the above steps are completed, you can install the shower room frame, place the bottom frame on the water barrier, and then fix the frame. The method is to use an electric screwdriver to nail the screws into the wall to secure the frame.

Third, shower room glass and top frame installation

After fixing the frame, the glass and top frame of the shower room are installed. If you install it carelessly, it is easy to see problems such as not being able to seam it.

1. Install tempered glass

If the shower room consists of two pieces of tempered glass and two sliding doors, then after installing the bottom frame and the wall frame, the next two pieces of tempered glass are installed. The installation of tempered glass first needs to be placed in a position, and then the bottom is fixed.

These two pieces of tempered glass do not need to be moved, so they need to be fixed with accessories. The first is to use the U-shaped accessory card holder, then use pliers and a screwdriver to secure the nut and screw to the bottom frame connection.

2, install the top frame

The first step: After the installation of the two tempered glass is completed, the fixed top frame can be installed. In fact, after the top frame is secured against the wall frame, it is necessary to try to check whether the docking is accurate.

Step 2: Before the formal fixed installation, it is also necessary to locate and drill holes to determine the fixed position.

Step 3: Handle the screws attached to the fixed part of the top frame in advance so that the fixed glass and sliding door can be installed next.

Step 4: After drilling, installing the rubber particles, and handling the joints, you can use the electric screwdriver and screws to fix the top frame.

Fourth, shower room sliding door and handle installation

After the main frame is installed, the installation of the sliding door and the handle is left. The importance of sliding doors is self-evident. Installation must be carried out with care and must be adjusted to ensure smooth sliding and closed without seams.

1. Install the sliding door wheel

Holes for mounting the wheel have been reserved on the general sliding door glass. Moving the door requires the use of a pulley. First, the two wheels above the upper sliding door need to be installed. After the wheel is installed, it is placed in the corresponding position, and then the lower wheel is debugged.

2, fixed sliding door

After the sliding door is placed, it needs to be fixed. Fixing does not mean that it cannot be moved at all, but does not let it out of the frame. The fixing method is still the same, using pliers and a screwdriver to fasten the connector.

3, debugging sliding door

After the sliding door is installed, there must be no less debugging. Try to see if the sliding door is open and closed smoothly, and whether it is closed without gaps. If there is a gap, you need to take measures to debug it.

4, install the sliding door handle

The sliding door also needs to be fitted with a handle, and the handle installation is relatively simple. First separate the handles, then align the holes in the glass and fix them with a screw connection.

5, the gap is coated with glass glue

After the basic installation of the shower room is completed, it needs to be waterproof. Using glass glue sticks, glass glue can be applied to aluminum frames and walls to prevent future water penetration.

6, the installation finishes

At this point, the installation of the shower room has been completed, and finally the finishing work. Wipe the entire shower room with a rag, etc. In addition, install the tools, remaining accessories, etc., and pay attention to the finished product protection.

Although it is only a simple four steps, it is not easy at all. It is useful to know a lot about the decoration knowledge. When you are a small expert, it is a super wind!

An evacuated tube is two glass tubes, one within the other, joined at each end. The space between these tubes is evacuated so the space is under a vacuum seal. Vacuums are excellent insulators (think thermos.) The inner tube is coated with a selective coating that converts light into heat.

 

Guaranteed for fifteen years (the longest warranty on the market) Linuo tubes are made from high quality borosilicate glass and are fused together. This provides an all glass seal. The Linuo evacuated tube uses a unique three layer selective coating instead of the standard single al-n/al coating. It consists of an infrared emission layer, an absorption layer and an anti-reflective layer, giving a much improved performance.

All Glass Evacuated Tube 58-1800mm

glass tube, vacuum tube, evacuated tube, vacuum tube with selective coating, evacuated tube with selective coating

Linuo Ritter International Co.,Ltd , https://www.lnrtsolarenergy.com